Atjaunināt sīkdatņu piekrišanu

North American Tunneling 2008 Proceedings [Multiple-component retail product, part(s) enclosed]

Edited by , Edited by , Edited by , Edited by
  • Formāts: Multiple-component retail product, part(s) enclosed, 884 pages, height x width x depth: 244x175x38 mm, weight: 1406 g, Figures; Maps; Tables, black and white, Contains 1 CD-ROM
  • Izdošanas datums: 01-Jan-2008
  • Izdevniecība: Society for Mining Metallurgy & Exploration
  • ISBN-10: 0873352637
  • ISBN-13: 9780873352635
Citas grāmatas par šo tēmu:
  • Multiple-component retail product, part(s) enclosed
  • Cena: 201,15 €
  • Grāmatu piegādes laiks ir 3-4 nedēļas, ja grāmata ir uz vietas izdevniecības noliktavā. Ja izdevējam nepieciešams publicēt jaunu tirāžu, grāmatas piegāde var aizkavēties.
  • Daudzums:
  • Ielikt grozā
  • Piegādes laiks - 4-6 nedēļas
  • Pievienot vēlmju sarakstam
  • Formāts: Multiple-component retail product, part(s) enclosed, 884 pages, height x width x depth: 244x175x38 mm, weight: 1406 g, Figures; Maps; Tables, black and white, Contains 1 CD-ROM
  • Izdošanas datums: 01-Jan-2008
  • Izdevniecība: Society for Mining Metallurgy & Exploration
  • ISBN-10: 0873352637
  • ISBN-13: 9780873352635
Citas grāmatas par šo tēmu:
Papers from a recent conference deal with a wide range of subjects related to nearly all aspects of underground construction, representing perspectives of manufacturers, designers, owners, and contractors. Material is organized in four sections on technology, design, project planning and implementation, and case histories. Some specific topics addressed are soft ground technology, tunnel designs, seismic design, cost estimating and scheduling, and alternative delivery and contracting strategies. Case histories from North America highlight experiences in NATM/SEM tunneling, soft ground/pressurized face tunneling, rock tunneling, shafts and portals, and tunnel rehabilitation and repair. The readership for the book includes all professionals involved in the underground construction industry, including designers, contractors, suppliers, and business owners. Annotation ©2008 Book News, Inc., Portland, OR (booknews.com)

North American Tunneling is a "must read" for any professional involved in the underground construction industry. You'll get a down-and-dirty look into dozens of case histories from throughout the world. You'll learn about the challenges faced by designers, contractors, suppliers, and business owners, and how they worked together to overcome them.

Taken from a collection of papers presented at the June 2008 North American Tunneling Conference, you'll benefit from the latest thinking on technical advances; new solutions to old problems; fire safety and risk management; design considerations; complex systems; overcoming changes; construction management; cost estimating and scheduling; and tunnel rehabilitation and repair.

Whether it's pipe jacking under the Leipzig train station, boring a water tunnel beneath New York Harbor, or tunneling under glaciers in British Columbia, these internationally recognized experts share their real-life experiences and insights into this rapidly evolving industry.

You'll also get a sneak peak into major projects on the drawing boards, projects that will be making big headlines in the months and years ahead.

Preface ix
TRACK 1: TECHNOLOGY
Session 1: Technology in the Big City
1(34)
Water Tunnel Beneath New York Harbor
2(11)
Mohammad R. Jafari
Michael Schultz
Roger Howard Jr.
Rehabilitation of New Croton Aqueduct Shafts
13(14)
W. James Marold
Carlos Zambrano
Arnie Fareth
Designing Continuous Conveyor Systems in Urban Environments: The 63rd Street Access Tunnel in New York City
27(8)
Dean Workman
Session 2: Technical Advances
35(34)
The Current State of Disc Cutter Design and Development Directions
36(10)
Joe Roby
Tyler Sandell
John Kocab
Leif Lindbergh
Comparison of Different Blast Design Models, Using a Blasting Software
46(6)
Roozbeh Afzali
Mehdi Yavari
Ali Naghibzadeh
Tunnel Boring Machine Development
52(6)
Martin Herrenknecht
Karin Bappler
Solid Cast Polymer Tunnel Segments: The Corrosion Resistant Solution for Sanitary Sewer Tunnels
58(4)
Richard A. Cubeta
Extensive Concrete and Shotcrete Systems for the World's Longest Tunnel (Gotthard Base Tunnel---56km)
62(7)
Jurg Schlumpf
Session 3: Old Problems/New Solutions
69(40)
Small Diameter Tunneling---Pipe Jacking Under Leipzig Main Train Station
70(5)
Klaus Rieker
Erwin Mattrisch
Investigation and Cement Grouting of Big Creek Tunnel 2: A Leaking Historic Hydroelectric Tunnel
75(6)
David Van Horsen
Increased TBM Mobility and Adaptations for Special Projects
81(10)
Dennis Ofiara
Utilization of Strain Measurements on Shielded Tunnel Boring Machines
91(10)
Brad Murray
John Waggoner
Sam Swartz
Howard Lum
Underground Construction Photography: Documenting a Success Story
101(8)
Susan L. Bednarz
Session 4: Applied Technology
109(36)
Comparison of Performance of Two Commonly Used Flexible Dilatometers (FDT) in Determining Deformation Modulus of a Tunnel Host Rocks
110(5)
Morteza Gharouni Nik
EPB TBM Technology
115(5)
Werner Burger
Pre-conditioning/Pre-excavation Grouting of the Soils Prior to Tunneling Below Highways and Railways: Case Histories from the Past Decade
120(9)
Alex Naudts
Ward Naudts
Disc Cutter Performance in Boulder-Laden Ground
129(8)
D. S. Kieffer
C. Leelasukseree
G. G. W. Mustoe
A 4.75m Contractor Manufactured EPB Machine
137(8)
Bruce Richardson
Larry Snyder
Session 5: Soft Ground Technology
145(38)
The Use of Polymer Concrete in Sewage Tunnels for One-Pass Segmental Linings
146(6)
Christian Maguire
Emad Iskander
Pre-Support Measures for Shallow NATM Tunneling in Urban Settings
152(11)
Vojtech Gall
Kurt Zeidler
Jet Grout Ground Modifications for the Brightwater Conveyance System
163(5)
Richard Hanke
Michael Blanding
Earth Pressure Balance Machines for the Silicon Valley Rapid Transit Project---Basis of Design
168(9)
Jimmy Thompson
James Chai
Alastair Biggart
David Young
Recent Developments in North America in the Design of Precast Concrete Tunnel Linings
177(6)
Brian Garrod
Tomas Gregor
TRACK 2: DESIGN
Session 1: Fire Life Safety and Rehabilitation
183(28)
Fire Safety Design for the New South Ferry Terminal Project in the New York City Subway
184(5)
J. Greg Sanchez
Sankar Chakraborty
Overview of NFPA 502 Standard for Road Tunnels, Bridges and Other Limited Access Highways, 2008 Edition
189(5)
William Connell
Jason R. Gamache
Connections to Old Tunnels---Design Guidelines
194(7)
Jozef F. Zurawski
Edmond Petrossian
Rehabilitation of the 80-Year-Old North Outfall Sewer (NOS) Tunnel
201(10)
Wolfgang Roth
Ethan Dawson
Peter McDonald
Alex Naudts
Alex Reyman
Session 2: Underground Design Considerations
211(52)
Initial Support Design for Tunnels in Horizontally Bedded Sedimentary Rock
212(6)
Irwan S. Halim
Wern-Ping (Nick) Chen
Roger Ilsley
Design of Rock Shafts Adjacent to Heavily Loaded Columns
218(7)
Nikolas K. Sokol
Eric C. Wang
Geology of the Clean Water Coalition's Proposed Reach 4 Tunnel and its Effect on Design, Las Vegas, NV
225(5)
Ray Brainard
Richard Rudd
Eugene Smith
James Devlin
California High Speed Rail: Driving the Next Level in Dynamic Tunnel Design
230(6)
Carrie Pourvahidi
Dan Tempelis
Field Application of NTH Fracture Classification at the Second Manapouri Tailrace Tunnel, New Zealand
236(7)
Don F. Macfarlane
Charles R. Watts
Bjorn Nilsen
Analysis of the Hydro-fracture Potential Around Water Tunnels in Rock
243(8)
Emad Iskander
Rock Mass Mechanical Behavior Assessment at the Porce III Underground Powerhouse Complex, Colombia
251(12)
Ludger Suarez-Burgoa
Session 3: Tunnel Designs
263(50)
NATM Tunnels at Stanford Linear Accelerator Center, Menlo Park, California
264(7)
P. J. Doig
Design of the University Link Tunnels and Stations
271(8)
Daniel N. Adams
Isabelle Lamb
Amanda Morgan
John Sleavin
NATM/SEM Analyses for San Francisco's Transbay Extension Tunnel
279(9)
Steve Klein
Yiming Sun
Eileen Cooney
East Side Access---Segmental Lining Design Challenges for Closely Spaced and Shallow Tunnels
288(6)
D. I. Smith
S. Sadek
J. Liu
Design of Large and Shallow Caverns of New York Second Avenue Subway
294(8)
Verya Nasri
Carlos Carranza-Torres
Nils Pettersson
Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO Project
302(11)
Jean Habimana
Irwan Wern-Ping (Nick) Chen
Mirza M. Rabbaig
Robert Barbour
Session 4: Complex Underground Systems
313(60)
Large-Diameter Tunneling Collapses: Recovery Design and Execution
314(8)
Bradford F. Townsend
C. R. Speers
G. Peach
Risk Management of the Canada Line Transit Tunnels
322(12)
Brendan Henry
Marco Moccichino
Design and Construction of Tunnel and Shaft Plugs
334(11)
W. James Marold
Peter Kolenda
A Discussion on Design Methods to Improve Long-Term Performance of Tunnel Projects
345(6)
Lei Fu
Connection of TARP Tunnel to Thornton Quarry Reservoir
351(13)
Mohammad Djavid
Kevin Fitzpatrick
Engineering Geology and Cavern Design for New York City
364(9)
Christopher Snee
Session 5: Design Parameters and Seismic Design
373(66)
Geological Parameters Affecting Open Hard-Rock Tunnel Boring Machine Performance
374(7)
Taehong Kim
Geotechnical Investigation for Design of Largest USA Highway Tunnel Cross Section in Challenging Geotechnical Conditions
381(8)
Julian Prada
Derek O'Neill
Raymond Blanchard
Geotechnical Conditions and TBM Selection for the Bay Tunnel
389(10)
Luke Erickson
Peter Raleigh
Victor Romero
Numerical Analysis of Time-Dependent Creep Behaviour of Tunnel Support Systems
399(6)
R. Chen
J. C. Small
Preliminary Seismic Design Considerations for a Highway Tunnel in Coronado, California
405(12)
David Young
Anil Dean
Stuart Warren
Alan Haldin
Tomas Gregor
Design Analyses for a Large-Span Tunnel in Weak Rock Subject to Strong Seismic Shaking
417(11)
Bhaskar B. Thapa
Johannes Van Greunen
Yiming Sun
Michael T. McRae
Hubert Law
Seismic Design Evaluation of the Bay Tunnel
428(11)
Yiming Sun
Steve Klein
Jan Van Greunen
Paul Louie
TRACK 3: PROJECT PLANNING AND IMPLEMENTATION
Session 1: Overcoming Changes
439(32)
San Francisco's Central Subway, Extending the Third Street Light Rail to Chinatown
440(10)
Matthew E. Fowler
The Fallacy of Tunnel Formwork Removal
450(5)
Wern-Ping (Nick) Chen
Beach Sewer Tunnel Rehabilitation
455(6)
Albert Ruiz
David Jurich
Dulles Corridor Metrorail Extension Project---Tunneling Options for Tysons Corner
461(10)
John Rudolf
Vojtech Gall
Session 2: Construction Management
471(54)
Benefits of Early Collaboration Between Designers and Suppliers in Tunnel Design
472(6)
Gunther M. Volkmann
Simon Stephenson
Thomas J. Ireland
Transbay Transit Center---Keeping DTX on Track
478(11)
Derek J. Penrice
Bradford F. Townsend
Robert Beck
Edmond Sum
Bold and Visionary Planning of Tunnels and Underground Space
489(8)
Harvey W. Parker
Columbus Circle Station Complex---History and Rehabilitation
497(7)
Aram Grigoryan
Caldecott Improvement Project
504(4)
William W. Edgerton
Construction Management Saves Time, Money and Improves Quality During Design and Construction
508(5)
Behrouz Tehrani
Rock Mass Characterization for the WSSC Bi-County Water Tunnel
513(12)
Paul Headland
Nick Strater
Mohamed Younis
Session 3: Risks for Engineers and Constructors
525(40)
Risk and Life Cycle Costs and Benefits for Underground Projects
526(7)
Harvey W. Parker
John Reilly
Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor
533(7)
Samuel J. Gambino
Galen S. Klein
Ram B. Kulkarni
Dwayne H. Deutscher
Walter Thistlewaite
Duong D. Nguyen
Risk Considerations and Design for the Downtown Deep Sewer Tunnels, Austin, Texas
540(7)
Greg Wieland
Eric Dawson
Jon Kaneshiro
Phil Colton
Russell Jernigan
Lewis Yates
Randy Pohren
Stan Evans
Establishing Geotechnical Baseline Values for Deep Soft Ground Tunnels
547(11)
John E. Newby
Michael B. Gilbert
Leon E. Maday
Nacimiento Lake Tap
558(7)
Clay Haynes
John R. Hollenbeck
Chris Mueller
Session 4: Cost Estimating and Scheduling
565(50)
Devil's Slide Tunnels---Unique Challenges
566(4)
Y. Nien Wang
Skip Sowko
Moe Amini
This Is Where the Money Is! The Impact of Contract Front End Documents on Tunneling Projects
570(6)
James G. McKelvey
Robert J. F. Goodfellow
Cary Hirner
Probable Cost Estimating and Risk Management
576(9)
John Reilly
Scheduling Fast-Track Tunnel Construction Projects
585(2)
Valerie (Wollet) Rebar
Allegheny River Tunnel Crossing Project
587(7)
Paul A. Roy
Marco D. Boscardin
Andy J. Miller
Tunneling Challenges in the Nation's Capital
594(9)
Moussa Wone
Leonard R. Benson
Francois G. Bernardeau
Ronald E. Bizzarri
Andrew M. Stone
Steven B. Fradkin
Phased Approach to Stormwater Tunnel Rehabilitation
603(12)
Todd Wanless
Jamie Martens
Scott Vollink
Session 5: Alternative Delivery and Contracting Strategies
615(30)
The Owner's Manual on Contracting Strategies for Large Projects
616(8)
Faruk Oksuz
Robert Goodfellow
Chris Mueller
Getting the Right Contract Package
624(7)
W. W. Edgerton
G. W. Davidson
Alternative Contracting Methods---An Update
631(9)
John Reilly
Geotechnical Baseline Reports for Construction---Second Edition
640(5)
Randall J. Essex
TRACK 4: CASE HISTORIES
Session 1: NATM/SEM Tunneling
645(24)
Mining Cross Passages Using NATM/SEM on the Los Angeles Metro Eastside Extension Tunnels
646(13)
Christophe Bragard
Brett Zernich
Johannes Jager
Stanford LCLS Project---Detailed Construction Design for the Intersection Between Access Tunnel and FEH Cavern
659(10)
Heiner J. Sander
Steffen Matthei
Zuzana Skovajsova
Max John
Thomas Marcher
Session 2: Soft Ground/Pressurized Face Tunneling
669(70)
L-73 Tunnel, Woodbury, Minnesota
670(7)
Michael B. Gilbert
E. Scott Dentz
Battery Park Truck Sewer Emergency Tunnel Project
677(10)
Mark Rybak
Todd Brown
EPB Tunneling in Canada
687(7)
Laura McNally
Steve Skelhorn
Tunneling-Pipe Jacking of Large Diameter Pipes in O'Hare International Airport
694(9)
Mohammand Djavid
Lewis Shapiro
Christopher P. Arman
Design and Construction of EPB Tunnels Within an Artesian Groundwater Aquifer---Addressing Environmental Issues
703(7)
Adrian Coombs
Steve Skelhorn
Derek Zoldy
Completion and Commissioning of the SMART Dual-Purpose Tunnel
710(9)
Arthur Darby
Design and Construction of the DLR Extension to Woolwich Arsenal, London, UK
719(10)
Andy Alder
Railroad Crossing by Microtunneling: MTBM Successfully Mines Side-by-Side Twin Tunnels Six Feet Below Railroad---West Elizabeth Avenue Storm Drainage Project, Linden, New Jersey
729(10)
Keith Schaeffer
Jozef F. Zurawski
Lucy Glodkowski
Session 3: Rock Tunneling
739(66)
San Vicente to 2nd Aqueduct Pipeline---Tunnel: Drill and Blast in Advance of an Open-Face Digger Shield
740(9)
Brett Campbell
Gordon Revey
Brian Garrod
Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project
749(17)
Brain Fulcher
Michael Bell
Knut Garshol
Design and Construction of the Bored, Two-Pass Niagara Water Diversion Tunnel
766(16)
Russel Delmar
Mike Hughes
David Besaw
Erich Kapeller
The Construction of the Manhattan Water Tunnel, New York City
782(12)
Edward (Ted) Dowey
Tunnelling Under Glaciers---Construction Update: Galore Creek Mine Access Tunnel, British Columbia, Canada
794(6)
Dean Brox
Peter Procter
Claude Venne
Denis Lepinay
Lorne Frost
Final Tunnel Liner at Mill Creek 3 Project---Case Study
800(5)
M. Schafer
B. Lukajic
R. Pintabona
M. Kritzer
R. Switalski
S. Janosko
Session 4: Shafts and Portals
805(30)
Shaft Sinking at the Seymour---Capilano Filtration Plant
806(6)
Andreas Prucker
Joe Rotzien
Andrew Saltis
Mitigating Tunnel Launch and Reception Challenges
812(12)
Steven W. Hunt
Andrew J. Finney
Design and Construction of the Fields Point Tunnel Pump Station for the Narragansett Bay Commission CSO Abatement Program, Providence, Rhode Island
824(11)
Geoffrey Hughes
John Kaplin
Irwan Halim
Philip Albert
Session 5: Tunnel Rehabilitation and Repair
835(38)
Condition Assessment and Rehabilitation of Tunnels: Case Histories from California's Water Tunnels
836(9)
David Van Horsen
Jon Kaneshiro
Fred Kintzer
R. McManus
C. Ovalle
Heartland Corridor Tunnels
845(8)
Frank P. Frandina
Paul E. Gabryszak
Ben Strauss
Raw Water Tunnel Condition Assessment
853(8)
Rafeal C. Castro
Brian M. Lakin
Glenn M. Boyce
Blake D. Rothfuss
Case Histories of Rehabilitation of French Railway Tunnels
861(12)
Verya Nasri
Christian Winum
Index 873